10 - 12 weeks lead time on sash windows

Grade 2 Sash Window Repair

Mr. Cook
before
after

Hammer

Mr. Cook

  • Job Value : £6500

  • Location : Shrewsbury

Details : x3 double glazed sashes installed into existing frames and decoration. Existing frames had subsided a lot. Grade 2 listed building with planning consent approved. The lower half of the boxes were completely rebuilt including replacement cills, outerjambs and pulley stiles. The frames were re-sealed to the brickworks.