Details : x3 double glazed sashes installed into existing frames and decoration. Existing frames had subsided a lot. Grade 2 listed building with planning consent approved. The lower half of the boxes were completely rebuilt including replacement cills, outerjambs and pulley stiles. The frames were re-sealed to the brickworks.